Latest News

Telangana DISCOM Floats 1.2 MW Solar Tender | Renewable Energy 2025

ChatGPT Image Oct 10, 2025, 11_25_15 AM

🌞 Telangana DISCOM Invites Bids for 1.2 MW Solar Project at Karimnagar

The Telangana power distribution company (DISCOM) has invited bids for the development of a 1.2 MW ground-mounted solar project at Nerella substation in Karimnagar district. This initiative is part of the state’s broader plan to boost clean energy capacity and strengthen decentralized power generation in Telangana.

📌Tender Overview

  • Capacity: 1.2 MW
  • Location: Nerella Substation, Karimnagar, Telangana
  • Last Date for Bid Submission: October 10, 2025
  • Scope: Design, supply, installation, testing, commissioning, and 5 years of O&M
  • Module Type: TOPCon / Mono PERC / Bifacial
  • Minimum Efficiency: 20.9%

☀️ High-Efficiency Solar Modules

The tender mandates high-efficiency solar modules (≥ 20.9%) to maximize generation and lower lifecycle costs. Technologies like TOPCon, Mono PERC, and bifacial modules are expected to ensure long-term performance and reliability.

⚡ Smart Monitoring and Grid Stability

The project includes remote performance monitoring, enabling:

  • Real-time data access 📊
  • Quick fault detection 🔧
  • Higher uptime & efficiency ⚡
  • Smooth integration with smart grids 🌐

🌿 Driving Telangana’s Renewable Energy Growth

Telangana is among the top solar-powered states in India. This 1.2 MW solar tender will help:

  • Reduce dependence on fossil fuels 🏭
  • Strengthen rural grid infrastructure 🏘️
  • Contribute to India’s 500 GW renewable energy target by 2030 🇮🇳

📈 EPC & Developer Opportunities

This tender creates solid opportunities for solar EPC companies, investors, and developers looking to expand in Telangana. With a clear scope, moderate capacity, and efficient technology requirements, it’s a strategic project for experienced solar players.

✅ Conclusion

The Telangana DISCOM 1.2 MW solar project represents a key step toward a sustainable power future. By integrating advanced solar technologies and smart grid systems, the state continues to set benchmarks in India’s renewable journey.

📅 Bid Deadline: October 10, 2025
📍 Location: Karimnagar, Telangana

Make a Comment

Your email address will not be published. Required field are marked*

Cart (0 items)
Select the fields to be shown. Others will be hidden. Drag and drop to rearrange the order.
  • Image
  • SKU
  • Rating
  • Price
  • Stock
  • Availability
  • Add to cart
  • Description
  • Content
  • Weight
  • Dimensions
  • Additional information
Click outside to hide the comparison bar
Compare